back to 2078 index
2078 Assembly
Speed Control
The chassis with all components removed.
The chassis with the speed select and fine pitch control installed.

Step pulley:
A silicon nitride ceramic bearing ball is held in place with a small dab of
bearing brease
After lubricating the shaft and bearing bore with Texaco Regal R&O 46 the
clean step pulley slides over the shaft and comes to a rest over the bearing
ball.

Idler wheel
Phenolic shim and nylon thrust washer cleaned and re-installed.
A nice new Mirko idler wheel & tire.
installed.
Checking the height position of idler tire relative to the driving step
pulley. Needs an adjustment.
One of three points of adjustment. We'll make our first adjustment here.
That's more like it.

Voltage decal
before
After replacing with a reproduction of the original.
